Summer is the time for Asphalt

 

Logo with black background
July, 2018
Corestone Paving and Construction
Summer is upon us as this year is passing by as quickly as all the others.  Before you know it, fall, winter and Christmas will be here!  With that being said, we want to make sure that all of your asphalt parking lots are repaired, sealed and ready to go as winter is NOT a good time to lay asphalt.
Sincerely,
Corestone Paving & Construction

Asphalt is very sensitive to temperatures and moisture.  The colder the weather, the quicker it hardens. This gives the contractor less time to work with the asphalt, and you want the most quality outcome of the product and your parking lot.
To lay an inch and a half of asphalt, the weather needs to be at least 70 degrees Fahrenheit for the contractor to be able to work with the asphalt in a timely manner.  Moisture and wind will also play a part in the decision of delaying the job.  Too much moisture and it will be re-scheduled for a dryer day.
Corestone Paving, a Tomball Asphalt Company, can eliminate the stress in the repairs.  We specialize in pavement repair, replacement and maintenance of existing facilities as well as installation of paving for new/ground up developments.  We will make sure the weather, the temperature, and the moisture level are at just the right window of opportunity for your asphalt repairs and/or installations.
 
Call us today for a free estimate!  We provide Quality, Performance, Experience, and Integrity.
 
Your Satisfaction is Our Core Concern
 
 
 
 
Corestone Paving
14511 Mary Jane
Tomball, TX 77377
281-651-0616

www.corestonepaving.comBOMA Logo

CAI Logo

HAA Logo

IFMA

Like us on Facebook     Follow us on Twitter     View our profile on LinkedIn     Visit our blog

 

This email was sent to [email protected] by [email protected] |

 

Corestone Paving & Construction | 14511 Mary Jane | Tomball | TX | 77377